Assessment and rehabilitation studies of the drinking water systems

For each drinking water distribution network (Saida and Bechar towns: 400,000 inhabitants, network: 1,000km):

  • Data entry of drawings and existing system Geographical Information System (GIS)
  • Diagnosis of existing distribution network and copy writing of bidding document
  • Diagnosis of the existing water supply system
  • Preparation of the master plan for the refurbishment and the extension of the water supply network
  • Supporting the technical and commercial management of the public corporation
  • Project execution dates
    from April 2007 to October 2008
  • Localization
    Saïda, Béchar​ / Algeria
  • Expertise domains
    • Commercial optimization
    • Operational assistance
    • Organizational strengthening
    • Technical optimization
Description of the WMI service

Studies​

  • Diagnosis of existing distribution networks
    • Improvement of network zoning
    • Network diagnosis: measurement campaign and leak detection programme
    • Leak detection program training for local staff (using geophones or ground microphones and occasionally acoustic correlators) on a total length of over 600 km (almost 100% of the supply and distribution networks linear of the two towns studied)
  • Assessment of the technical and customer services management​
    • Analysis of drinking water network management
    • Assistance for the implementation of a leak detection permanent cell
    • Elaboration of a software system for leak detection
    • GIS updating and network computerised modelling
    • Assessment of the customer services management
    • Assessment of customer relationship
    • Proposal of reorganisation
    • Evaluation of management performances

Supply and laying of hydraulic equipment​

  • 210 zoning valves (Ø from 100 to 300 mm)
  • 50 division metres (DN 150 to 300 mm)
  • 8 flowmetres (DN 300 and 400 mm)
  • 18 anti-reverse valves (DN 100 to 250 mm)
  • Construction of corresponding chambres and sight holes

Training of technical and senior staff​

  • Leak detection training
  • Management training
Key Results
  • 600 km
    water distribution network​ analysed for leak detection
  • Optimized customer management​
  • Equipment supply and technical transfer to the water utilities of Saida and Bechar​
  • Technical and financial basis prepared for tendering for the rehabilitation and extension of potable water system​