Audit of transfer lines between the Méfou dam, the treatment plant and the tanks Messa, Attémangué and Mission. Rehabilitation of the canalization using tubing.​

  • Project execution dates
    from September 2012 to February 2013
  • Localization
    Yaoundé / Cameroon
  • Expertise domains
    • Technical optimization
Description of the WMI service

Preparation and realization of pressure test:​

  • Network between the dam Méfou and the treatment plant, ND900, length of 2 km
  • Network between the treatment plant and the tank Messa, ND500 & ND 600, length of 14 km


Flow measurement and diagnostic:

  • Network between the tanks Attémengué, Messa and Mission, ND500, length of 6 km


Camera diagnostic:​

  • Network between the treatment plant and the tank Messa, ND500 and ND600, length of 14 km
Key Results
  • Localization of the weak points of the network in order to carry out the rehabilitation of pipelines
  • Fouling inside the pipes has been defined to select the most suitable method for cleaning before tubing rehabilitation