Optimization of distribution network and non-revenue water reduction through active pressure control

The project aimed at the optimization of the distribution network by reducing non-revenue water in 17 sub-sectors of Bogota (zone 4 district) through active pressure control.

The 2 mains activities of the project were:​

  • Update hydraulics model for 17 sub-districts
  • Design, supply and install 17 active pressure control stations
  • Project execution dates
    from January 2015 to September 2015
  • Localization
    Bogota / Colombia
  • Expertise domains
    • Technical optimization
Description of the WMI service

Update hydraulic model for 17 sub-districts:​

  • Flow-pressure measurement campaign​
  • Model calibration

Design, supply and install 17 active pressure control stations with permanent pressure logging:​

  • Selection and sizing of 17 appropriate hydraulic pressure management control valves with hydraulically dampened switching between dual set points
  • Supply, installation and commissioning into service of 17 pressure management control valves (ND 3” to 8” with by-pass) and associated equipment, forming part of the pressure management chamber
Key Results
  • 17 sub-sectors
    with new active pressure control stations with permanent logging of data​
  • Non-revenu water reducting: reduction of physical losses through better off-peak pressure regulation