Rehabilitation of the water distribution system of San Andres island

On the island of San Andrés, located in the Caribbean Sea off the Nicaraguan coast, only a third of the population has access to drinking water.

In this context, WMI mission is to reduce losses in the San Andrés drinking water distribution network and increase connections for consumers.

  • Project execution dates
    from April 2019 to July 2020
  • Localization
    San Andres / Colombie
  • Expertise domains
    • Commercial optimization
    • Operational assistance
    • Organizational strengthening
    • Technical optimization
Description of the WMI service

Rehabilitation of 27 km of network:

  • Installation with pipe bursting: trenchless method of installation for 10.1 km of HDPE pipe ND90 to ND355 at the same location at the existing network,
  • Traditional installation: method with trenches for the replacement of 16.9 km of HDPE pipe ND90 to ND355.

The network is completely located in dense and touristic areas, therefore WMI had to implement non traditional installation methods such as pipe bursting.

Investigation and zoning of the network:

  • Evaluation of the network: installation of meters, modelling and calibration of the model,
  • Definition of the sectors and installation of the valves for regulation and operation:
    • Installation and construction of 29 meters set and pressure logger in concrete chambers,
    • 210 gate valves.

A specialized team in modelling and hydraulic sectorization based in Bogota and Cali allowed a synergy and a continuous optimization of the construction of the new distribution network.

Consumers: Increase of the served population

  • Installation of 3,200 new connections.

Services:

  • Training of local working force for special works such as pipe bursting and HDPE welding,
  • Training of the operators for the operation and maintenance of the new sectors and the network.
Key Results
  • 27
    km of network, ND90 to ND355 installed
  • 29
    meters set on hydraulic sectors and pressure control valves
  • 3,200
    connections to consumers
  • 210
    gate valves
Image n°2224
Image n°2225
Image n°2223